Continuity Inspection
- Remove the CPP switch.
- Verify that the continuity between CPP switch terminals A and B is as indicated in the table.
- If there is no malfunction, perform the Circuit Open/Short Inspection .
- If there is any malfunction, replace the CPP switch.