LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mazda >> 2004 >> MPV ES >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Knock Sensor Inspection >> Circuit Open/Short Inspection >> Notes
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Circuit Open/Short Inspection: Notes

  1. Disconnect the PCM connector. (See PCM REMOVAL/INSTALLATION .)
  2. Connect the SST  (104 Pin Breakout Box) with the PCM disconnected.
  3. Tighten the connector attaching bolt.

    Tightening torque 

    3.0-5.4 N.m {30-56 kgf.cm, 27-48 in.lbf} 

    Fig 1: Connecting Special Service Tool (104 Pin Breakout Box) With PCM Disconnected
    G00993870Courtesy of MAZDA MOTORS CORP.
  4. Inspect the following wiring harness for open or short circuit (Continuity check).
    Fig 2: Identifying Knock Sensor Connector Terminals (View From Terminal Side)
    G00993871Courtesy of MAZDA MOTORS CORP.