LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mazda >> 2004 >> MPV ES >> Repair and Diagnosis >> Engine Performance >> Fuel Delivery >> Fuel System >> Fuel Injector Inspection >> Circuit Open/Short Inspection >> Notes
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Circuit Open/Short Inspection: Notes

  1. Disconnect the PCM connector. (See PCM REMOVAL/INSTALLATION .)
  2. Connect the SST  (104 Pin Breakout Box) with the PCM disconnected.
  3. Tighten the connector attaching bolt.
    1. Tightening torque 
    2. 3.0-5.4 N.m {30-56 kgf°Cm, 27-48 in.lbf} 
      Fig 1: Connecting Special Service Tool (104 Pin Breakout Box)
      G00991577Courtesy of MAZDA MOTORS CORP.
  4. Inspect the following wiring harness for open or short circuit (continuity check).
    Fig 2: Identifying Main Relay Harness Side Connector Terminals
    G00991578Courtesy of MAZDA MOTORS CORP.