LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mazda >> 2005 >> 3 L4-2.3L >> Repair and Diagnosis >> Powertrain Management >> Computers and Control Systems >> Relays and Modules - Computers and Control Systems >> Body Control Module >> Testing and Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Body Control Module: Testing and Inspection

PASSENGER JUNCTION BOX (PJB) CONFIGURATION




1. Connect the WDS or equivalent to the DLC-2 (16-pin).
2. Set up the WDS or equivalent (including the vehicle recognition).
3. Select "Module Programming".
4. Select "Programmable Module Installation".
5. Select "GEM" and perform procedures according to directions on the WDS or equivalent screen.
6. Select "Module Programming".
7. Select "Programmable Parameters".
8. Select "Module Reset".
9. Select "GEM" and perform procedures according to directions on the WDS or equivalent screen.
10. Retrieve DTCs using the WDS or equivalent and verify that there is no DTC present.
- If any DTC is present, perform applicable DTC inspection. (See DTC TABLE [PJB].)