Diagnostic procedure
DTC P0102 DIAGNOSTIC PROCEDURE
| STEP | INSPECTION | ACTION | |
|---|---|---|---|
| 1 | VERIFY FREEZE FRAME DATA HAS BEEN RECORDED
|
Yes | Go to the next step. |
| No | Record the FREEZE FRAME DATA on the repair order, then go to the next step. | ||
| 2 | VERIFY RELATED REPAIR INFORMATION AVAILABILITY
|
Yes | Perform repair or diagnosis according to the available repair information.
|
| No | Go to the next step. | ||
| 3 | INSPECT POOR CONNECTION OF MAF SENSOR CONNECTOR
|
Yes | Repair or replace the terminals, then go to Step 8. |
| No | Go to the next step. | ||
| 4 | INSPECT POWER SUPPLY CIRCUIT FOR OPEN CIRCUIT
|
Yes | Go to the next step. |
| No | Inspect for open circuit in wiring harness between MAF/IAT sensor terminal B (wiring harness-side) and main relay. Repair or replace wiring harness, then go to Step 8. | ||
| 5 | INSPECT POOR CONNECTION OF PCM CONNECTOR
|
Yes | Repair the terminal, then go to Step 8. |
| No | Go to the next step. | ||
| 6 | INSPECT MAF SENSOR SIGNAL CIRCUIT FOR OPEN CIRCUIT
|
Yes | Go to the next step. |
| No | Repair or replace the wiring harness, then go to Step 8. | ||
| 7 | INSPECT MAF SENSOR SIGNAL CIRCUIT FOR SHORTS
|
Yes | Repair or the wiring harness, then go to the next step. |
| No | Replace the MAF/IAT sensor, then go to the next step. (See INTAKE-AIR SYSTEM REMOVAL/INSTALLATION [LF] , INTAKE-AIR SYSTEM REMOVAL/INSTALLATION [L3] .) | ||
| 8 | VERIFY TROUBLESHOOTING OF DTC P0102 COMPLETED
|
Yes | Replace the PCM, then go to the next step. (See PCM REMOVAL/INSTALLATION .) |
| No | Go to the next step. | ||
| 9 | VERIFY AFTER REPAIR PROCEDURE
|
Yes | Go to the applicable DTC troubleshooting. (See DTC TABLE ) |
| No | Troubleshooting completed. | ||