Diagnostic procedure
DTC P0123 DIAGNOSTIC PROCEDURE
| STEP | INSPECTION | ACTION | |
|---|---|---|---|
| 1 | VERIFY FREEZE FRAME DATA HAS BEEN RECORDED
|
Yes | Go to the next step. |
| No | Record FREEZE FRAME DATA on repair order, then go to the next step. | ||
| 2 | VERIFY RELATED REPAIR INFORMATION AVAILABILITY
|
Yes | Perform repair or diagnosis according to available repair information.
|
| No | Go to next step. | ||
| 3 | INSPECT THROTTLE BODY CONNECTOR
|
Yes | Go to the next step. |
| No | Connect the connector securely, then go to Step 10. | ||
| 4 | INSPECT THROTTLE BODY CONNECTION FOR POOR CONNECTION
|
Yes | Repair or replace the terminal, then go to Step 10. |
| No | Go to the next step. | ||
| 5 | INSPECT TP SENSOR
|
Yes | Go to the next step. |
| No | Replace the throttle body, then go to Step 10. | ||
| 6 | INSPECT TP1 SIGNAL CIRCUIT FOR SHORT TO POWER SUPPLY
|
Yes | Repair or replace short to power supply. Then, go to Step 10. |
| No | Go to the next step. | ||
| 7 | VERIFY TP SIGNAL CIRCUIT FOR SHORT TO CONSTANT VOLTAGE CIRCUIT
|
Yes | Repair or replace suspected harness, then go to Step 10. |
| No | Go to the next step. | ||
| 8 | INSPECT PCM CONNECTOR FOR POOR CONNECTION
|
Yes | Repair the terminal, then go to Step 10. |
| No | Go to the next step. | ||
| 9 | VERIFY TP SENSOR GROUND CIRCUIT FOR OPEN CIRCUIT
|
Yes | Repair or replace open circuit between TP sensor connector terminal A (wiring harness-side) and PCM connector terminal 2M (wiring harness-side). Then, go to the step. |
| No | Go to the next step. | ||
| 10 | VERIFY TROUBLESHOOTING OF DTC P0123 COMPLETED
|
Yes | Replace the PCM, then go to the next step. (See PCM REMOVAL/INSTALLATION .) |
| No | Go to the next step. | ||
| 11 | VERIFY AFTER REPAIR PROCEDURE
|
Yes | Go to the applicable DTC inspection. (See DTC TABLE ) |
| No | Troubleshooting completed. | ||