LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mazda >> 2005 >> MPV ES >> Repair and Diagnosis >> Engine Performance >> Fuel Delivery >> Fuel System >> Fuel Injector Inspection >> Circuit Open/Short Inspection >> Notes
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Circuit Open/Short Inspection: Notes

  1. Disconnect the PCM connector. (See PCM REMOVAL/INSTALLATION .)
  2. Connect the SST  (104 Pin Breakout Box) with the PCM disconnected.
  3. Tighten the connector attaching bolt.

    Tightening torque 

    1. 3.0-5.4 N.m {30-56 kgf.cm, 27-48 in.lbf} 
    Fig 1: Connecting Breakout Box
    G03699901Courtesy of MAZDA MOTORS CORP.
  4. Inspect the following wiring harness for open or short circuit (continuity check).
    Fig 2: Identifying Harness Side Connector (Main Relay)
    G03699902Courtesy of MAZDA MOTORS CORP.