Pinpoint Test 5: The Block Heater Does Not Operate Correctly
NOTE:
- Before carrying out the following test, diagnose any PCM DTCs.
PINPOINT TEST 5: BLOCK HEATER DOES NOT OPERATE CORRECTLY
| PINPOINT TEST 5 | THE ELECTRIC COOLING FAN(S) IS INOPERATIVE/DOES NOT OPERATE CORRECTLY - 3.0L | ||
|---|---|---|---|
| STEP | INSPECTION | ACTION | |
| 1 | CHECK LOW SPEED OPERATION OF THE ELECTRIC COOLING FANS
|
Yes | Go to next step. |
| No | If both fans are inoperative in low speed and the RH fan is inoperative in high speed, Go to step 5. If both fans are inoperative in low speed and both fans operate in high speed, REPAIR circuit (LB/B) for an open. TEST the system for normal operation. If both fans are inoperative in low speed and the LH fan is inoperative in high speed, Go to step 3. | ||
| 2 | CHECK CIRCUIT (B) FOR AN OPEN
|
Yes | CARRY OUT the relay component test on cooling fan high speed relay 2. If the relay tests good, REPAIR circuit (LB/B) for an open. TEST the system for normal operation. |
| No | REPAIR circuit (B) for an open. TEST the system for normal operation. | ||
| 3 | CHECK CIRCUIT (B) FOR AN OPEN
|
Yes | Go to next step. |
| No | REPAIR circuit (B) for an open. TEST the system for normal operation. | ||
| 4 | CHECK CIRCUIT (GY/R) FOR AN OPEN
|
Yes | INSTALL a new LH cooling fan motor. TEST the system for normal operation. |
| No | REPAIR circuit (GY/R) for an open. TEST the system for normal operation. | ||
| 5 | CHECK CIRCUIT (B/LG) FOR VOLTAGE
|
Yes | Go to next step. |
| No | REPAIR circuit (B/LG) for an open. TEST the system for normal operation. | ||
| 6 | CHECK CIRCUIT (R/O) FOR AN OPEN
|
Yes | CARRY OUT the relay component test on cooling fan low speed relay. If the relay tests good, Go to next step. |
| No | REPAIR circuit (R/O) for an open. TEST the system for normal operation. | ||
| 7 | CHECK CIRCUIT (LB/B) FOR AN OPEN
|
Yes | INSTALL a new RH cooling fan motor. TEST the system for normal operation. |
| No | REPAIR circuit (LB/B) for an open. TEST the system for normal operation. | ||