LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mazda >> 2006 >> MPV ES >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Knock Sensor Inspection >> Circuit Open/Short Inspection >> Notes
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Circuit Open/Short Inspection: Notes

  1. Disconnect the PCM connector. (See PCM REMOVAL/INSTALLATION .)
  2. Connect the SST  (104 Pin Breakout Box) with the PCM disconnected.
    Fig 1: Connecting 104 Pin Breakout Box
    G04328180Courtesy of MAZDA MOTORS CORP.
  3. Tighten the connector attaching bolt.

    Tightening torque 3.0-5.4 N.m {30-56 kgf.cm, 27-48 in.lbf} 

  4. Inspect the following wiring harness for open or short circuit (Continuity check).
Fig 2: Identifying Knock Sensor Connector
G04328346Courtesy of MAZDA MOTORS CORP.