Fuel Cut Control System Inspection
NOTE:
- This inspection has to be performed after the Fuel Injector Operation Inspection.
If simulation function of M-MDS is used:
- Warm up the engine and idle it.
- Connect the M-MDS to the DLC-2.
- Select the RPM and the FUELPW1 PIDs.
- Monitor both PIDs while performing the following steps.
- Depress the accelerator pedal and increase the RPM PID to 4,000 RPM.
- Quickly release the accelerator pedal (brake pedal is not depressed) and verify that the FUELPW1 PID is 0 msec
, and 2-5 msec
, when the RPM PID drops below 1,200 RPM.
- If not as specified, inspect the following.
- ECT sensor and related wiring harness
- Neutral switch and related wiring harness
(See NEUTRAL SWITCH INSPECTION ).
- Clutch switch and related wiring harness
- If not as specified, inspect the following.
If simulation function of M-MDS is not used:
- Warm up the engine and idle it.
- Measure the fuel injector control signal wave profile using the oscilloscope while performing the following steps.
- Depress the accelerator pedal and increase the engine speed to 4,000 RPM.
- Quickly release the accelerator pedal (brake pedal is not depressed) and verify that the wave profile constant B+
, and the wave appears when the engine speed drops below 1,200 RPM.
(See PCM INSPECTION ).
- If not as specified, inspect the following.
- ECT sensor and related wiring harness
- Neutral switch and related wiring harness
(See NEUTRAL SWITCH INSPECTION ).
- Clutch switch and related wiring harness
- If not as specified, inspect the following.