Smart Junction Box (SJB): Installation
- Install the SJB.
- Install the 3 screws.
- Connect the electrical connectors.
- Install the RH lower cowl trim panel.
- Connect the battery. See BATTERY DISCONNECT .
- Download the SJB configuration information from the IDS or equivalent tester. For additional information, refer to
PROGRAMMABLE MODULE INSTALLATION ,
.NOTE:
- When successful, this step clears the manufacturing mode DTCs.
- Carry out TPMS sensor training. For additional information, refer to TIRE PRESSURE MONITORING SYSTEM (TPMS) SENSOR TRAINING , .