Installation Note
- Install the PCM and the 2 nuts.
Tightening torque:
10 Nm {1.0kgf-m, 89 in-lbf}
- Connect the 3 PCM electrical connectors.
- Position the ground wire terminals and install the stud bolt.
Tightening torque:
10 Nm {1.0 kgf-m, 89 in-lbf}
- Install the PCM wiring harness retainer nut.
Tightening torque:
10 Nm {1.0 kgf-m, 89 in-lbf}
NOTE:- If a new PCM is installed, the parameters must be reset in both the PCM and the instrument cluster module or the vehicle will experience a PATS no start. This will occur even if the vehicle is not equipped with PATS. PATS vehicles and non-PATS vehicles have parameters in the instrument cluster module and the PCM and they both must be reset whenever a new PCM is installed.
- Restore the module configurations for the instrument cluster and the PCM. Carry out the module configuration restore steps of the Programmable Module Installation. See PROGRAMMABLE MODULE INSTALLATION , .