Main Relay Operation Inspection: Notes
- Verify that the main relay clicks when the ignition is switched ON and then off.
- If there is no operation sound, inspect the following:
- Main relay Refer too RELAY INSPECTION .)
- Wiring harness and connector between battery and main relay terminal A
- Wiring harness and connector between PCM terminal 2K and main relay terminal E
- If there is no operation sound, inspect the following: