Load compensation inspection
- Start the engine and let it idle.
- Connect the M-MDS to the DLC-2.
- Select the RPM PID.NOTE:
- Excludes temporary idle speed drop just after the loads are turned on.
- Verify that the engine speed is within specification under each load condition.
- If the load condition is not as specified, inspect the following:
- A/C switch and related wiring harness system (A/C request signal is always on or off) (See NO. 23 A/C DOES NOT WORK SUFFICIENTLY .) (See NO. 24 A/C IS ALWAYS ON OR A/C COMPRESSOR RUNS CONTINUOUSLY .)
- Electrical load
- Charging system (See BATTERY INSPECTION .) (See GENERATOR INSPECTION .)
Idle-up speed (P position or N position)
A/C on: 650-800 RPM
Electrical loads on: 650-800 RPM