Function Inspection
- Connect the M-MDS to the DLC-2.
- Switch the ignition ON (engine off).
- Display the PIDs WGV_ACT and WGP. (See ON-BOARD DIAGNOSTIC TEST .) (See PCM INSPECTION .)
- Compare the voltage and opening angle indications for the PIDs WGV_ACT and WGP with the standard in the table indicated below.
- If they do not match the standard, perform the voltage inspection. (See VOLTAGE INSPECTION .)