With GST
- Start engine and warm it up to the normal operating temperature.
- Turn ignition switch OFF and wait at least 10 seconds.
- Start engine and keep the engine speed between 3, 500 and 4, 000 RPM for at least 1 minute under no load.
- Let engine idle for 1 minute.
- Open engine hood.
- Set voltmeter probe between ECM terminal 74 and ground.
- Keep engine speed at 2, 500 RPM constant under no load.
- Make sure that the voltage does not vary for more than 5 seconds.
If the voltage fluctuation cycle takes less than 5 seconds, GO TO "DIAGNOSTIC PROCEDURE ".
- 1 cycle: 0.6 - 1.0 V --> 0 - 0.3 V --> 0.6 -1.0 V