Grind Complete
Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).
| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
| 1.5L Eng,O.H.C.- SOHC, w/Air Cond | | 8.1 | | A |
| 1.5L Eng,O.H.C.- SOHC, w/o Air Cond | | 7.9 | | A |
| Additional Procedure: VALVE: Grind Complete: |
| Where Pwr Strg Interferes add | | 0.2 | 0.2 | A |
| Combination Procedure: ROCKER ARM ASSEMBLY: Disassemble & Assemble: |
| In-Line4, Both | | 0.7 | | B |
| In-Line4, One Shaft | | 0.5 | | B |
| Combination Procedure: VALVE SPRING ASSEMBLED HEIGHT: Correct: |
| Per 3 Springs | | 0.2 | | A |