Installation Procedure
- Install the generator to the vehicle and position the generator above the drive axle.
- Install electrical harness to retainer on right fender well.
- Install the power steering pump to the engine. Refer to Power Steering Pump Replacement (LA1 ) or Power Steering Pump Replacement (LY7) in Power Steering System.
- Install the fuel pressure test port (schrader valve) cap to the fuel injector rail.
- Install the power steering pipes from the power steering pipe retainer.
- Install the generator bracket. Refer to Generator Bracket Replacement .
- Install the drive belt tensioner. Refer to Drive Belt Tensioner Replacement in Engine Mechanical - 3.4L.
- Install the generator to the generator bracket and position the generator above the drive axle.
- Install the drive belt tensioner. Refer to Drive Belt Tensioner Replacement in Engine Mechanical - 3.4L.
- Install the generator to the generator bracket.
- Install the generator front bolt.
- Install the generator rear bolts.
Tighten: Tighten the generator bolts to 50 N.m (37 lb ft).
- Install the drive belt. Refer to Drive Belt Replacement in Engine Mechanical - 3.4L.
- Install the generator electrical connector.
- Install the generator B+ lead.
- Install the generator B+ terminal nut.
Tighten: Tighten the generator B+ terminal nut to 13 N.m (115 lb in).
- Rotate the engine rearward and install the engine mount strut bracket bolts. Refer to Rotating the Engine for Service Access in Engine Mechanical - 3.4L.
- Install the battery ground (negative) cable to the battery. Refer to Battery Negative Cable Disconnect/Connect Procedure (LA1) or Battery Negative Cable Disconnect/Connect Procedure (LY7) .
NOTE:
Refer to Fastener Notice in Cautions and Notices.