Installation Procedure
- Install the PCM (1) to the mounting bracket.
- Connect the PCM connectors (2).
Tighten: Tighten the PCM connector end fasteners to 9 N.m (80 lb in).
- Install the air cleaner assembly. Refer to Air Cleaner Assembly Replacement .
- Connect the engine coolant surge tank. Refer to Surge Tank Replacement in Engine Cooling.
- Connect the negative battery cable. Refer to Battery Negative Cable Disconnect/Connect Procedure in Engine Electrical.
- If a new PCM is being installed, program the PCM. Refer to Service Programming System (SPS) in Programming.
- When ever the PCM or the negative battery cables have been disconnected, the Idle Learn procedure must be performed. Refer to Idle Learn Procedure , and the Crankshaft Variation procedure must be performed. Refer to CKP System Variation Learn Procedure .
NOTE:
Do not touch the connector pins or soldered components on the circuit board in order to prevent possible electrostatic discharge (ESD) damage to the PCM.
NOTE:
In order to prevent internal damage to the PCM, the ignition must be OFF when disconnecting or reconnecting the PCM connector.
NOTE:
Refer to Fastener Notice
in Cautions and Notices.