Transmission Assembly: Remove, Install, and Overhaul
TRANS ID - 5L40E
Includes: Inspect and replace all necessary components and road test. Includes: Flush Cooling Lines.| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| 2.4L Eng | Includes: R&I Intake Manifold. Includes:Drain and refill Low Temperature Cooling System. Includes: Perform Relearn procedure. | 13.5 | A | |
| Combination Procedure: FLYWHEEL: Remove & Replace: | ||||
| 0.3 | C | |||