Installation Procedure
- Install the Shift Lock Control Module/Shift Lock Solenoid assembly, then the retaining screw (2).
- Connect the electrical connector (1).
- Install the front floor console. Refer to Front Floor Console Replacement .
- Connect the negative battery cable.