Component Testing
- Install a 10A fused jumper wire between the control circuit terminal A and 12 volts. Install a jumper wire between the transmission shift select switch (park) signal circuit terminal B and ground.
- Listen for the solenoid to turn ON and OFF.
- If the function does not perform as specified, replace the shift lock actuator.