Installation Procedure
- Install the shift solenoid assembly from the shift control assembly.
- Connect the shift solenoid assembly wiring retainers to the shift control assembly.
- Install the shift solenoid retaining screw.
Tighten: Tighten the screw to 3 N.m (27 lb in).
- Install the shift indicator bulb from the shift control assembly.
- Install the shift control assembly.
NOTE:
Refer to FASTENER NOTICE
in Cautions and Notices.