Installation Procedure
- Install the boost control solenoid (2) and bolt.
Tighten: Tighten the bolt to 10 N.m (89 lb in).
- Connect the boost control solenoid connector.
NOTE:
Refer to Fastener Notice
in Cautions and Notices.
Tighten: Tighten the bolt to 10 N.m (89 lb in).