Installation Procedure
WARNING: This page is about a different car, the 2005 Saturn Ion Red Line, 2005 Saturn Ion 3, 2005 Saturn Ion 2, and 2005 Saturn Ion 1. However, it is still accessible from the selected car via links, so may be relevant.
- Install the BCM to the vehicle and install the retaining nuts.
Tighten: Tighten the nuts to 10 N.m (88 lb in).
- Connect the large I/P wiring harness connector (2) to the BCM.
- Connect the small I/P wiring harness connector (1) to the BCM.
- Connect the large body wiring harness connector (2) to the BCM.
- Connect the small body wiring harness connector (1) to the BCM.
- Connect the OnStar® connector.
- Pull back the carpet and position the center support bracket into position.
- Install the center support bracket nuts.
Tighten: Tighten the nuts to 10 N.m (88 lb in).
- Install the wiring harness rosebud to the center support bracket.
- Install the front floor console. Refer to Console Replacement - Front Floor in Instrument Panel, Gages, and Console.
- Connect the negative battery cable. Refer to Battery Negative Cable Disconnect/Connect Procedure in Engine Electrical.
- Program a new or a remanufactured BCM. Refer to Control Module References .
NOTE:
Refer to Fastener Notice
in Cautions and Notices.