Transmission Assembly: Remove, Install, and Overhaul
WARNING: This page is about the Sky Red Line, Automatic, which is a different variant/trim than selected.
Includes: Inspect and replace all necessary components, adjust and road test.
Includes: Flush Cooling Lines.| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| 2.0L Eng | Includes: R&I Turbocharger. Includes: R&I Intake Manifold. Includes:Drain and refill Low Temperature Cooling System. | 17.8 | A | |
| Combination Procedure: FLYWHEEL: Remove & Replace: | ||||
| 0.3 | C | |||