Component Testing
- Install a 10A fused jumper wire between the control circuit terminal 3 and 12 volts. Install a jumper wire between the ground circuit terminal 9 and ground.
- Listen for the solenoid to turn ON and OFF.
- If the function does not perform as specified, replace the transmission control.