2AZ-FE Charging: Generator: Installation
- INSTALL GENERATOR ASSEMBLY
- Install the wire harness clamp bracket with the bolt.
Torque: 8.4 N*m (85 kgf*cm, 74 in.*lbf)
- Confirm that the wire harness of the crankshaft position sensor is secured to the wire harness clamp bracket through the back of the rib of the timing chain cover.
- Install the generator with the 2 bolts.
Torque:
21 N*m (215 kgf*cm, 16 ft.*lbf) for bolt A
52 N*m (530 kgf*cm, 38 ft.*lbf) for bolt B
- Install the 2 wire harness clamps.
- Connect the generator wire with the nut.
Torque: 9.8 N*m (100 kgf*cm, 7 ft.*lbf)
- Install the terminal cap.
- Connect the generator connector.
- Install the wire harness clamp bracket with the bolt.
- INSTALL FAN AND GENERATOR V BELT (See INSTALLATION )
- INSTALL FRONT FENDER APRON SEAL RH
- Install the apron seal with the 3 clips and 2 screws.
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM INITIALIZATION
- Perform initialization (see INITIALIZATION
).NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see INITIALIZATION
).