2AZ-FE Engine Control System: ECM: Installation
- INSTALL ECM
- Install the ECM with the bolt and screw.
Torque: 5.5 N*m (56 kgf*cm, 49 in.*lbf)
- Connect the 4 ECM connectors.
- Install the wire harness clamp.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
- Install the ECM with the bolt and screw.
- INSTALL GLOVE COMPARTMENT DOOR (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM INITIALIZATION
- Perform initialization (see INITIALIZATION
).NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see INITIALIZATION
).