Inspection Procedure
- INSPECT FUSE (AM1, GAUGE, FL DOOR)
- Remove the AM1, GAUGE, FL DOOR fuses from the instrument panel junction block.
- Measure the resistance of the fuses.
Standard resistance:
Below 1 Ω
NG: REPLACE FUSE
OK: Go to next step
- INSPECT IGNITION RELAY NO. 1 (Marking: IG1)
- Remove the IG1 relay from the instrument panel junction block.
- Measure the resistance of the relay.
Standard resistance
RESISTANCE SPECIFICATIONTester Connection Specified Condition 3 - 5 10 kΩ or higher 3 - 5 Below 1 Ω (when battery voltage is applied to terminals 1 and 2)
NG: REPLACE IGNITION RELAY NO. 1
OK: Go to next step
- CHECK WIRE HARNESS (POWER WINDOW REGULATOR MASTER SWITCH ASSEMBLY BATTERY AND BODY GROUND)
- Disconnect the P9 master switch connector.
- Measure the voltage and resistance of the wire harness side connector.
Standard voltage
VOLTAGE SPECIFICATIONTester Connection Condition Specified Condition P9-10 (B) - Body ground Always 11 to 14 V P9-20 (IG) - Body ground Ignition switch OFF Below 1 V P9-20 (IG) - Body ground Ignition switch ON 11 to 14 V Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Standard resistance
RESISTANCE SPECIFICATIONTester Connection Specified Condition P9-2 (GND) - Body ground Below 1 kΩ
NG: REPAIR OR REPLACE HARNESS AND CONNECTOR
OK: REPLACE POWER WINDOW REGULATOR MASTER SWITCH ASSEMBLY