LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Scion >> 2009 >> tC Automatic >> Repair and Diagnosis >> Engine Performance >> 2AZ-FE Engine Control System >> Circuit Opening Relay >> On-Vehicle Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

On-Vehicle Inspection

  1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL 
    CAUTION: Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to prevent airbag and seat belt pretensioner activation.
  2. INSPECT CIRCUIT OPENING RELAY 
    1. Measure the resistance between the terminals.

      Standard resistance 

      TESTER CONNECTION SPECIFIED CONDITION CHART

      Tester Connection Specified Condition
      1B (11) - 1A (8) 10 kΩ or higher
      1B (11) - 1A (8) Below 1 Ω (when battery voltage is applied to terminals 1E (5) and 1D (1))

      If the result is not as specified, replace the instrument panel junction block.

  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
  4. PERFORM INITIALIZATION 
    1. Perform initialization (see INITIALIZATION ).
      NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery
      Fig 1: Inspecting Circuit Opening Relay
      G05539275Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002