LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Smart >> 2016 >> Fortwo Pure, Automatic DCT Trans >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Mixture Formation - 453 Chassis >> Testing & Repair >> Remove/Install Injection System Control Unit - AR07.08-P-7008SR
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Remove/Install Injection System Control Unit - AR07.08-P-7008SR

ENGINE 281 in MODEL 453 

Shown on model 453.0 

G12094415Courtesy of MERCEDES-BENZ USA
NOTES Information on preventing damage to electronic components due to electrostatic discharge   AH54.00-P-0001-01A
REMOVINGINSTALLING Remove/install     
1 Perform initial startup of ME-SFI [ME] control unit (N3/10) When replacing the ME-SFI [ME] control unit (N3/10).  
REFER TO SELF-DIAGNOSTIC SYSTEMS     AD00.00-P-2000-06SR
2 Switch off ignition and remove transmitter key    
3 Remove right paneling in cargo area Engine 281 in model 453.4 AR68.30-P-4700SRC
Engine 281 in model 453.0 AR68.30-P-4800SR
Engine 281 in model 453.3 AR68.30-P-4800SRA
4 Release and disconnect electrical connection (1)    
5 Release and disconnect electrical connection (2)    
6 Release and disconnect electrical connection (3)    
7 Remove screw/bolts (4) and remove from ME-SFI [ME] control unit (N3/10)    
8 Install in the reverse order