LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Subaru >> 2008 >> Tribeca Base >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Fuel Injection System (H6DO) >> Intake Manifold >> Assembly
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Intake Manifold: Assembly

NOTE: When assembling the nipple, apply liquid gasket.

Liquid gasket: 

THREE BOND 1105 (Part No. 004403010) or equivalent 

Tightening torque: 

17 N.m (1.7 kgf-m, 12.5 ft-lb) 

  1. Install the EGR valve. <Ref. to INSTALLATION , EGR Valve.>
  2. Tighten the bolts which install fuel pipes on intake manifold.

    Tightening torque: 

    6.4 N.m (0.7 kgf-m, 4.7 ft-lb) 

    Fig 1: Locating Bolts Installing Fuel Pipes On In-Take Manifold (1 Of 2)
    G05667571Courtesy of SUBARU OF AMERICA, INC.
    Fig 2: Locating Bolts Installing Fuel Pipes On In-Take Manifold (2 Of 2)
    G05667572Courtesy of SUBARU OF AMERICA, INC.
  3. Connect the fuel injector pipe to fuel hose, and tighten the clamp screw.

    Tightening torque: 

    1.5 N.m (0.2 kgf-m, 1.1 ft-lb) 

    Fig 3: Identifying Fuel Hose
    G05667570Courtesy of SUBARU OF AMERICA, INC.
  4. Install the purge control solenoid valve. <Ref. to INSTALLATION , Purge Control Solenoid Valve.>
  5. Install the manifold absolute pressure sensor. <Ref. to INSTALLATION , Manifold Absolute Pressure Sensor.>
  6. Install the throttle body to intake manifold. <Ref. to INSTALLATION , Throttle Body.>
  7. Install the engine harness to the intake manifold. <Ref. to ENGINE HARNESS , COMPONENT, General Description.>