LEMON Manuals
: Even more car manuals for everyone: 1960-2025
Home
>>
Subaru
>>
2009
>>
Forester XT
>>
Repair and Diagnosis
>>
Engine Performance
>>
Engine Control Systems
>>
Fuel Injection System (H4DOTC)
>>
Tumble Generator Valve Assembly
>>
Installation
April 5, 2026:
LEMON Manuals is launched!
Read the announcement.
Tumble Generator Valve Assembly: Installation
Install in the reverse order of removal.
NOTE:
Use a new gasket.
Tightening torque:
8.3 N.m (0.8 kgf-m, 6.1 ft-lb)
Fig 1: Locating Intake Manifold Bolts
Courtesy of SUBARU OF AMERICA, INC.