Oil Charge Pipe: Installation
- Apply ATF on a new O-ring and install together with the oil charge pipe.NOTE: Use new bolts.
Tightening torque: 38 N.m (3.9 kgf-m, 28.0 ft-lb)
- Install the air intake chamber. Refer to INSTALLATION , Air Intake Chamber.
Tightening torque: 38 N.m (3.9 kgf-m, 28.0 ft-lb)