Oil Charge Pipe: Installation
- Install the oil charge pipe.NOTE: Use new gaskets and O-rings.
Tightening torque:
38 N.m (3.9 kgf-m, 28.0 ft-lb)
- Connect the connector to the turbine speed sensor 1.
- Install the front exhaust pipe. Refer to FRONT EXHAUST PIPE .
- Install the under cover. Refer to FRONT UNDER COVER .
- Lower the vehicle.
- Connect the ground cable to battery.