Oil Charge Pipe: Installation
- Install the oil charge pipe with a new O-ring.NOTE: Use new bolts.
Tightening torque:
38 N.m (3.9 kgf-m, 28.0 ft-lb)
- Turn the turbine speed sensor 1 back to the original orientation, and install the bolt and connect the connector.
Tightening torque:
7 N.m (0.7 kgf-m, 5.2 ft-lb)
- Install the front exhaust pipe.
- Install the under cover.
- Lower the vehicle.
- Connect the ground cable to battery.