LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Subaru >> 2013 >> Outback Limited >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Fuel Injection System (H4DO) >> Tumble Generator Valve Assembly >> Inspection >> Check Motor
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Check Motor

  1. Connect the battery positive terminal to terminal No. 5 and the battery ground terminal to terminal No. 4, and check that the valve is fully opened on LH side and the valve is fully closed on RH side.
    CAUTION: Do not power the motor for more than 10 seconds.
    Fig 1: Checking Motor (Fully Opened On LH Side)
    G08579716Courtesy of SUBARU OF AMERICA, INC.
  2. Connect the battery positive terminal to terminal No. 4 and the battery ground terminal to terminal No. 5, and check that the valve is fully closed on LH side and the valve is fully opened on RH side.
    CAUTION: Do not power the motor for more than 10 seconds.
    Fig 2: Checking Motor (Fully Opened On RH Side)
    G08579717Courtesy of SUBARU OF AMERICA, INC.