Intake Manifold: Installation
- Install the engine harness to fuel injector pipe LH.
- Install the engine harness to fuel injector pipe RH.
- Install the intake manifold onto cylinder heads.NOTE: Use new O-rings.
Tightening torque:
25 N.m (2.5 kgf-m, 18.4 ft-lb)
- RH side
- LH side
- Install the EGR pipe securing bolt.NOTE: Use a new gasket.
Tightening torque:
6.4 N.m (0.7 kgf-m, 4.7 ft-lb)
- Install the bolts which hold fuel injector pipe RH to cylinder head.NOTE: Use new O-rings, injection rubbers, and seal rings.
Tightening torque:
19 N.m (1.9 kgf-m, 14.0 ft-lb)
- Connect #1, #3, and #5 fuel injector connectors.
- Install the fuel pipe protector RH.
Tightening torque:
19 N.m (1.9 kgf-m, 14.0 ft-lb)
- Install the feed hose to fuel pipe protector RH.
Tightening torque:
13 N.m (1.3 kgf-m, 9.6 ft-lb)
- Connect the connectors of the intake oil flow control solenoid valve RH.
- Install the bolts which hold fuel injector pipe LH to cylinder head.NOTE: Use new O-rings, injection rubbers, and seal rings.
Tightening torque:
19 N.m (1.9 kgf-m, 14.0 ft-lb)
- Connect the connectors of the oil temperature sensor, engine coolant temperature sensor and intake oil flow control solenoid valve LH.
- Connect #2, #4, and #6 fuel injector connectors. (B)
- Install the fuel pipe protector LH.
Tightening torque:
19 N.m (1.9 kgf-m, 14.0 ft-lb)
- Connect the fuel delivery hose (A) and evaporation hose (B).NOTE: If fuel hoses or clamps are damaged, replace them with new parts.
- Install the throttle body to the intake manifold.NOTE: Use new O-rings.
Tightening torque:
8 N.m (0.8 kgf-m, 5.9 ft-lb)
- Connect the engine harness connector.
- Connect the connector to the throttle body.
- Connect the PCV hose.
- Connect the following connectors.
- Install the securing clips to the two locations on the fuel pipe protector LH.
- Generator connector
- Generator terminal B
Tightening torque:
16 N.m (1.6 kgf-m, 11.8 ft-lb)
- Install the harness cover to the collector cover bracket.
- Magnet clutch connector
- Install the air intake chamber.
Tightening torque:
Clamp (A)
3 N.m (0.3 kgf-m, 2.2 ft-lb)
Bolt (B)
6.5 N.m (0.7 kgf-m, 4.8 ft-lb)
- Install the air cleaner case and intake boot. < Ref. to INSTALLATION , Air Cleaner Case. >
- Connect the brake booster vacuum hose to the intake manifold.
- Install the battery and battery carrier. < Ref. to INSTALLATION , Battery. >
- Install the collector cover.