Pitching Stopper
- Install the pitching stopper.
Tightening torque:
T1: 50 N.m (5.1 kgf-m, 36.9 ft-lb)
T2: 58 N.m (5.9 kgf-m, 42.8 ft-lb)
- Install the air intake chamber and intake boot. < Ref. to INSTALLATION , Air Intake Chamber. >
- Connect the battery ground terminal.