LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Subaru >> 2017 >> WRX Base >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Fuel Injection System (2.0L) >> Tumble Generator Valve Assembly >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Tumble Generator Valve Assembly: Installation

Install in the reverse order of removal.

NOTE: Use a new gasket.

Tightening torque: 

25 N.m (2.5 kgf-m, 18.4 ft-lb)