Extension Case: Installation
- Select the transfer drive gear shim. Ref. to CONTINUOUSLY VARIABLE TRANSMISSION (TR580)>REDUCTION DRIVEN GEAR>ADJUSTMENT .
- Select the transfer driven gear shim. Ref. to CONTINUOUSLY VARIABLE TRANSMISSION (TR580)>TRANSFER CLUTCH>ADJUSTMENT .
- Attach the selected transfer drive gear shim to extension case with vaseline.
- Attach the selected transfer driven gear shim to extension case with vaseline.
- Install a new O-ring to the Transmission case.NOTE: Apply CVTF to the O-rings.
- Apply liquid gasket to the mating surface of the extension case as shown in the figure, and temporarily install the extension case.NOTE:
- Before applying liquid gasket, degrease the old liquid gasket seal surfaces of the extension case and Transmission case.
- Install within 5 min. after applying liquid gasket.
Liquid gasket:
THREE BOND 1215B or equivalent
Liquid gasket applying diameter:
1.4 mm (0.0551 in)
- Install the extension case to Transmission hanger.
Tightening torque:
25 N.m (2.5 kgf-m, 18.4 ft-lb)
- Install the electric oil pump. Ref. to CONTINUOUSLY VARIABLE TRANSMISSION (TR580)>ELECTRIC FLUID PUMP>INSTALLATION .
- Install the Transmission body. Ref. to CONTINUOUSLY VARIABLE TRANSMISSION (TR580)>TRANSMISSION ASSEMBLY>INSTALLATION .