Transmission Harness: Installation
- Set the transmission harness, and install the clip.
- Connect the transmission harness to the control valve body. Refer to CONTINUOUSLY VARIABLE TRANSMISSION (TR580)>CONTROL VALVE BODY>INSTALLATION .
- Connect the ground terminal (valve cover side).
Tightening torque:
14 N.m (1.4 kgf-m, 10.3 ft-lb)
- Connect the connector to the inhibitor switch.
- Connect the ground terminal (electric oil pump side), and then connect the connector to the electric oil pump, turbine speed sensor, primary speed sensor, secondary speed sensor and secondary pressure sensor.
Tightening torque:
13 N.m (1.3 kgf-m, 9.6 ft-lb)
- Install the air breather hose. Refer to CONTINUOUSLY VARIABLE TRANSMISSION (TR580)>AIR BREATHER HOSE>INSTALLATION .
- Install the transmission body. Refer to CONTINUOUSLY VARIABLE TRANSMISSION (TR580)>TRANSMISSION ASSEMBLY>INSTALLATION .