LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Subaru >> 2020 >> Forester Base >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Transmission Control System >> Select Lever >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Select Lever: Installation

  1. Install the select cable. Refer to CONTROL SYSTEMS>SELECT CABLE>INSTALLATION .
  2. Install the select lever.

    Tightening torque: 

    18 N.m (1.8 kgf-m, 13.3 ft-lb)

  3. Connect the connector.
  4. Install the harness.
  5. Install the duct console center. Refer to AIR CONDITIONER>AIR VENT DUCT>INSTALLATION>CONSOLE DUCT CENTER .
  6. Install the clamp.
    NOTE: Insert it from the front side.
  7. Install the grip.
    NOTE: Install it while pressing on the clamp.
  8. Install the boot. (Model with boot shifter)
  9. Install the grip cover. (Model with gate shifter)
  10. Connect the select cable to the transmission main body.
    CAUTION: Do not apply excessive load while holding the part (a).

    Tightening torque: 

    25 N.m (2.5 kgf-m, 18.4 ft-lb)

    G13591814Courtesy of SUBARU OF AMERICA, INC.
    G13225470Courtesy of SUBARU OF AMERICA, INC.
  11. Adjust the select cable free play. Refer to CONTROL SYSTEMS>SELECT CABLE>ADJUSTMENT .
  12. Install the center exhaust cover.

    Tightening torque: 

    18 N.m (1.8 kgf-m, 13.3 ft-lb)

  13. Shift the select lever to "P range".
  14. Connect the ground terminal to battery sensor. Refer to REPAIR CONTENTS>NOTE>BATTERY .