Stabilizer Bushing
- Before installation, inspect the following items and replace any faulty part with a new one. Check the rubber bushing stabilizer front for abnormal cracks, fatigue or damage.
- Install the rubber bushing stabilizer front.
- Install the clamp stabilizer.
Tightening torque:
25 N.m (2.5 kgf-m, 18.4 ft-lb)
- Install the front exhaust pipe. (H4DO model) Refer to Exhaust (H4DO)>Front Exhaust Pipe>Installation .
- Install the center exhaust pipe (rear). (H4DOTC model) Refer to Exhaust (H4DOTC)>Center Exhaust Pipe>Installation>Center Exhaust Pipe (Rear) .
- Install the under cover front. Refer to Exterior/Interior Trim>Front Under Cover>Installation .