Intake Manifold: Installation
- Install the vacuum hose assembly to the water pipe assembly.
Tightening torque:
6.4 N.m (0.7 kgf-m, 4.7 ft-lb)
- Install the intake manifold and tumble generator valve assembly to the air intake adapter.NOTE: Use a new gasket.
Tightening torque:
25 N.m (2.5 kgf-m, 18.4 ft-lb)
- Connect the fuel delivery pipe (A) and vacuum hose (B) to the fuel pipe assembly.CAUTION:
- Check that there is no damage or dust on the quick connector. If necessary, clean the seal surface of the pipe.
- When connecting the quick connector, make sure to insert it all the way in before locking the slider.
- When it is difficult to lock the slider, check that the connector is fully inserted.
- After locking the slider, pull the quick connector itself to the disconnecting direction, and then push to the connecting direction in order to confirm secure connection. Make sure to end this check with a pushing step.
NOTE: Connect the quick connector as shown in the figure. - Install the fuel pipe assembly to the intake manifold.
Tightening torque:
6.4 N.m (0.7 kgf-m, 4.7 ft-lb)
- Connect the fuel delivery tube and evaporation hose.
- Connect the evaporation hose to fuel pipe assembly.
- Connect the connector on the fuel delivery tube to the fuel pipe assembly, and secure the fuel delivery tube using clip (A).CAUTION:
- Check that there is no damage or dust on the quick connector. If necessary, clean the seal surface of the pipe.
- When connecting the quick connector, make sure to insert it all the way in before locking the slider.
- When it is difficult to lock the slider, check that the connector is fully inserted.
- After locking the slider, pull the quick connector itself to the disconnecting direction, and then push to the connecting direction in order to confirm secure connection. Make sure to end this check with a pushing step.
NOTE: Connect the quick connector as shown in the figure.
- Connect the evaporation hose to fuel pipe assembly.
- Install the EGR pipe. Refer to EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES) (W/O STI)>EGR PIPE>INSTALLATION .
- Secure the engine wiring harness to the intake manifold using clip.
- Connect the connector (A) to the tumble generator valve RH.
- Connect the connector (B) to the tumble generator valve LH, and secure the fuel pipe protector to the intake manifold.
Tightening torque:
19 N.m (1.9 kgf-m, 14.0 ft-lb)
- Connect connectors to the manifold absolute pressure & intake air temperature sensor.
- Connect the connector to the purge control solenoid valve.
- Connect the vacuum hose to the canister pipe.
- Connect the vacuum control hose and vacuum hose to the vacuum pipe assembly.
- Secure the PCV pipe and generator cord to the intake manifold using the clip.
- Install the brake booster vacuum hose to the clip (D).NOTE: If the clip is removed from the intake manifold, install the clip to the position of alignment mark
of intake manifold.
- Connect sections (A) and (B) of the brake booster vacuum hose to the brake vacuum pump and intake manifold, and install the brake booster vacuum hose to the clip (C).
- Connect the preheater hose (B) to the throttle body, and connect the connector (A) to the throttle body.
- Connect the PCV hose to the PCV valve.
- Install the intake duct No. 3. Refer to INTAKE (INDUCTION) (W/O STI)>INTAKE DUCT>INSTALLATION>INTAKE DUCT NO. 3 .
- Install the intake duct No. 2. Refer to INTAKE (INDUCTION) (W/O STI)>INTAKE DUCT>INSTALLATION>INTAKE DUCT NO. 2 .
- Install the intercooler. Refer to INTAKE (INDUCTION) (W/O STI)>INTERCOOLER>INSTALLATION .
- Install the under cover. Refer to EXTERIOR/INTERIOR TRIM>FRONT UNDER COVER>INSTALLATION .
- Lower the vehicle.
- Connect the ground terminal to battery sensor. Refer to NOTE>NOTE>BATTERY .
- Fill engine coolant. Refer to COOLING(W/O STI)>ENGINE COOLANT>REPLACEMENT>FILLING OF ENGINE COOLANT .
- Install the collector cover. Refer to INTAKE (INDUCTION) (W/O STI)>COLLECTOR COVER>INSTALLATION .