Oil Pipe: Installation
- Use a new gasket to temporarily attach the oil pipe.
- Tighten the union bolt and bolt.
Tightening torque:
T1: 6.4 N.m (0.7 kgf-m, 4.7 ft-lb)
T2: 31.5 N.m (3.2 kgf-m, 23.2 ft-lb)
- Install the front exhaust pipe. Ref. to EXHAUST (H4DOTC)>FRONT EXHAUST PIPE>INSTALLATION .
- Install the V-belts. Ref. to MECHANICAL (H4DOTC)>V-BELT>INSTALLATION>V-BELT .
- Connect the ground terminal to battery sensor. Ref. to REPAIR CONTENTS>NOTE>BATTERY .
- Fill engine coolant. Ref. to COOLING (H4DOTC)>ENGINE COOLANT>REPLACEMENT>FILLING OF ENGINE COOLANT .
- Check the engine oil level and replenish the engine oil if necessary. Ref. to LUBRICATION (H4DOTC)>ENGINE OIL>INSPECTION .