RH Side
- Install the spark plug.
Tightening torque:
17.5 N.m (1.8 kgf-m, 12.9 ft-lb)
- Install the ignition coil (RH side). Ref. to IGNITION (H4DO)>IGNITION COIL>INSTALLATION>RH SIDE .
- Connect the ground terminal to battery sensor. Ref. to REPAIR CONTENTS>NOTE>BATTERY .