LH Side
- Install the ignition coil and connect the connector (A).CAUTION: Degrease the mounting bolts, rocker cover installation portion and ignition coil installation hole.
Tightening torque:
8 N.m (0.8 kgf-m, 5.9 ft-lb)
- Install the pipe evaporator cooling to the clip.
- Install the bolts and the nuts which secure the CVTF cooler pipe No. 2. (Model with CVTF cooler (air cool))NOTE: Use a socket with magnet (for preventing nut falling) to attach the nut through the gap of the front grille assembly.
Tightening torque:
7.5 N.m (0.8 kgf-m, 5.5 ft-lb)
- Attach the bracket.
Tightening torque:
7.5 N.m (0.8 kgf-m, 5.5 ft-lb)
- Place the engine wiring harness and secure the engine wiring harness to the bracket with the claw (A).
- Set the battery cable assembly, and secure the battery cable assembly to the bracket with claw (B).
- Install the engine wiring harness to the clip (A), and connect the connector (B) to the main fuse box.
- Connect the connector (C) to ECM. Ref. to FUEL INJECTION (FUEL SYSTEMS) (H4DO)>ENGINE CONTROL MODULE (ECM)>INSTALLATION
.
- Install the battery. Ref. to STARTING/CHARGING SYSTEMS (H4DO)>BATTERY>INSTALLATION .
- Connect the ground terminal to battery sensor. Ref. to REPAIR CONTENTS>NOTE>BATTERY .