LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 1991 >> Swift GT >> Repair and Diagnosis >> Engine Performance >> System >> Engine Controls - Basic Testing >> Ignition Checks >> Ignition Coil Power Unit >> Swift (DOHC)
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Swift (DOHC)

  1. To ensure power supply to power unit, disconnect primary wires connector at ignition coil. Turn ignition on. Using voltmeter, check voltage between coil positive terminal (Black/White wire) and ground. Battery voltage should exist. If not, check ignition fuse circuit. See Fig 2 .
  2. To check power unit resistance, turn ignition off. Remove power unit from under ignition coil. Tape together two 1.5-volt batteries in series to create a 3-volt power source. Install leads to 3-volt power source. Apply negative lead to "G" terminal and positive lead to terminal IB of power unit. See Fig 1 .
  3. Using ohmmeter, connect positive lead to terminal "G" and negative lead to terminal OC of power unit. See Fig 1 . Check for continuity with 3-volt power source applied to terminal IB. Check for NO continuity with 3-volt power source disconnected from terminal IB. See POWER UNIT RESISTANCE table. Replace power unit if test results are not within specification.
Fig 1: Testing Ignition Coil Power Unit (Swift DOHC)
G119580Courtesy of SUZUKI OF AMERICA CORP.
Fig 2: Testing Ignition Coil Power Supply (Swift DOHC)
G119579Courtesy of SUZUKI OF AMERICA CORP.
POWER UNIT RESISTANCE

Application Ohms
3-Volts At Terminal IB Continuity
No Voltage At Terminal IB No Continuity